Wiki source code of 17A-05 Connectivity
Version 1.1 by Barry Bishop on 2017/01/07 12:12
Hide last authors
author | version | line-number | content |
---|---|---|---|
![]() |
1.1 | 1 | |Test Number|T05 |
2 | |Test Name|Communication Range Check | ||
3 | |Test Leader|Christoph Ragonig | ||
4 | |Suit|Aouda.X | ||
5 | |Date|03. Jan. 2017 | ||
6 | |||
7 | The Com Range Check (Communication range) test is directed by the test leader Christoph Ragonig. | ||
8 | The range of the suit’s communication system is tested. Potential hazards within the tests is | ||
9 | distraction due to local people. This test involves three test-sections. | ||
10 | |||
11 | **Preparation and Set-up: **In advance, the Operations-box has to be set up and powered down. | ||
12 | Furthermore the W-LAN set-up and the LAN configuration has to be done. In the end the test side | ||
13 | has to be prepared. | ||
14 | |||
15 | **Testing: **The Hard Upper Torso has to be started and the communication with the OPS-Box has to be | ||
16 | established. During the Test the Aouda HUT is moved away from the OPS and the resistance of the | ||
17 | communication is checked. | ||
18 | |||
19 | **Finalising test and packing: **To successfully end Test 05, the test results have to be checked for their | ||
20 | consistency. So the test can be repeated right away and time wasting can be avoided. |