Changes for page 17A-05 Connectivity
Last modified by Barry Bishop on 2017/02/26 14:15
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -4,6 +4,15 @@ 4 4 |Suit|Aouda.X 5 5 |Date|03. Jan. 2017 6 6 7 +(% class="image" style="float:right" %) 8 +((( 9 +[[image:suit_connectivity_240.jpg]] 10 + 11 +((( 12 +Positioning the Aouda.X suit 13 +))) 14 +))) 15 + 7 7 The Com Range Check (Communication range) test is directed by the test leader Christoph Ragonig. The range of the suit’s communication system is tested. Potential hazards within the tests is distraction due to local people. This test involves three test-sections. 8 8 9 9 **Preparation and Set-up: **In advance, the Operations-box has to be set up and powered down. Furthermore the W-LAN set-up and the LAN configuration has to be done. In the end the test side has to be prepared. ... ... @@ -18,3 +18,4 @@ 18 18 |[[Ping statistics>>https://mission.oewf.org/archive_downloads/aoudatest17a/05-Connectivity/2017-01-05/ping-stats.txt]]|TCP/IP ping statistics 19 19 |[[Raw suit telemetry>>https://mission.oewf.org/archive_downloads/aoudatest17a/05-Connectivity/2017-01-05/telemetry/aouda-x/]]|Un-processed suit telemetry data 20 20 |[[CSV suit telemetry>>https://mission.oewf.org/archive_downloads/aoudatest17a/05-Connectivity/2017-01-05/telemetry-csv/aouda-x/]]|Processed CSV suit telemetry data 30 +