Hide last authors
Barry Bishop 1.1 1
ahirtl 2.1 2
Barry Bishop 1.1 3 === Details ===
4
ahirtl 2.1 5 |**Acronym**|TEAM
6 |**Description**|This survey study will examine key team-level variables (team cohesion, conflict, performance) and determine the “person” factors (including personality, and factors examined at the team level of analysis) that relate to the above team-level variables.
7 |**Principal Investigator (PI)**|Natalie Allen
8 |**Organisation** |University of Western Ontario
Barry Bishop 1.1 9
10 === Summary ===
11
ahirtl 2.1 12 The goals of this project are to (a) examine the level and fluctuation, over time, of key team-level variables (team cohesion, conflict, performance) during the AMADEE-18 Mars Simulation, and (b) determine the “person” factors (including personality, and factors examined at the team level of analysis) that relate to the above team-level variables. Variables will be measured by means of surveys completed on an interval of approximately every 5-days during the simulation.
Barry Bishop 1.1 13
14 === Objectives ===
15
ahirtl 2.1 16 The overall goals of this project are to (a) examine the level and fluctuation, over time, of key team-level variables (team cohesion, conflict, performance) during the AMADEE-18 Mars mission simulation in Oman, and (b) determine the “person” factors (examined at the team level of analysis) that relate to the above team-level variables. Through evaluating data from this mission as well as past and subsequent research, we will evaluate hypotheses regarding the relations among the key variables.
Barry Bishop 1.1 17
18 === Experiment Data ===
19
20 |=Date|=Files
Copyright 2018 - Österreichisches Weltraum Forum. All rights reserved.