Changes for page Aouda Test Campaign 17A
Last modified by Barry Bishop on 2017/02/26 11:27
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -10,20 +10,20 @@ 10 10 11 11 The following tests have been scheduled: 12 12 13 -|= Test|=Description14 -|[[01 Humidity Test>>doc:.17A-01 Humidity Test.WebHome]]|Demonstrate that the suit performs nominal under humid or light rain conditions.15 -|02 16 -|03 17 -|04 18 -|05 19 -|06 20 -|07 21 -|08 22 -|09 23 -|10 24 -|11 25 -|12 26 -|13 27 -|14 28 -|15 29 -|16 13 +|=No.|=Name|=Description 14 +|[[01>>doc:.17A-01 Humidity Test.WebHome]]|Humidity Test|Demonstrate that the suit performs nominal under humid or light rain conditions. 15 +|02|Head-up Display / HMI|Functionalities implemented in summer 2016 should perform nominal and show up on the head-up-display and be commanded by the analog astronaut. 16 +|03|Sensor Validation|The sensors shall demonstrate their performance under various environmental conditions. 17 +|04|Radiation Signature|This test measures the suits electromagnetic emission spectrum. 18 +|05|Connectivity| 19 +|06|Battery|Battery characterization. In this test the batteries connected to the suit will be tested. 20 +|07|Thermal Heating|A cryo/heat-test shall evaluate the suits performance between -110° to 35° Celsius. 21 +|08| | 22 +|09|Ergonomics|3d performance envelope determination. 23 +|10| | 24 +|11|Glove Dexterity|Glove Dexterity 25 +|12| | 26 +|13|CWS|Caution and Warning System Validation 27 +|14|Mass budget|Mass Budget and CG 28 +|15|Exoskeleton Stress Test|This test analysis the ergonomics of the exoskeleton for its next generation version. 29 +|16|Tesla Coil|A tesla coil will be deployed to test the vulnerability of the Aouda suit to lighting produced by Martian dust devils.