Changes for page Aouda Test Campaign 17A
Last modified by Barry Bishop on 2017/02/26 11:27
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -10,21 +10,20 @@ 10 10 11 11 The following tests have been scheduled: 12 12 13 -|=No.|=Name|=Description 14 -|01|Humidity Test|Demonstrate that the suit performs nominal under humid or light rain conditions. 15 -|02|Head-up Display / HMI|Functionalities implemented in summer 2016 should perform nominal and show up on the head-up-display and be commanded by the analog astronaut. 16 -|03|Sensor Validation|The sensors shall demonstrate their performance under various environmental conditions. 17 -|04|Radiation Signature|This test measures the suits electromagnetic emission spectrum. 18 -|05|Connectivity| 19 -|06|Battery|Battery characterization. In this test the batteries connected to the suit will be tested. 20 -|07|Thermal Heating|A cryo/heat-test shall evaluate the suits performance between -110° to 35° Celsius. 21 -|08| | 22 -|09|Ergonomics|3d performance envelope determination. 23 -|10| | 24 -|11|Glove Dexterity|Glove Dexterity 25 -|12| | 26 -|13|CWS|Caution and Warning System Validation 27 -|14|Mass budget|Mass Budget and CG 28 -|15|Exoskeleton Stress Test|This test analysis the ergonomics of the exoskeleton for its next generation version. 29 -|16|Tesla Coil|A tesla coil will be deployed to test the vulnerability of the Aouda suit to lighting produced by Martian dust devils. 30 - 13 +|=Test|=Description 14 +|[[01 Humidity Test>>doc:.17A-01 Humidity Test.WebHome]]|Demonstrate that the suit performs nominal under humid or light rain conditions. 15 +|02 Head-up Display / HMI|Functionalities implemented in summer 2016 should perform nominal and show up on the head-up-display and be commanded by the analog astronaut. 16 +|03 Sensor Validation|The sensors shall demonstrate their performance under various environmental conditions. 17 +|04 Radiation Signature|This test measures the suits electromagnetic emission spectrum. 18 +|05 Connectivity| 19 +|06 Battery|Battery characterization. In this test the batteries connected to the suit will be tested. 20 +|07 Thermal Heating|A cryo/heat-test shall evaluate the suits performance between -110° to 35° Celsius. 21 +|08 | 22 +|09 Ergonomics|3d performance envelope determination. 23 +|10 | 24 +|11 Glove Dexterity|Glove Dexterity 25 +|12 | 26 +|13 CWS|Caution and Warning System Validation 27 +|14 Mass budget|Mass Budget and CG 28 +|15 Exoskeleton Stress Test|This test analysis the ergonomics of the exoskeleton for its next generation version. 29 +|16 Tesla Coil|A tesla coil will be deployed to test the vulnerability of the Aouda suit to lighting produced by Martian dust devils.